![]() |
SABB L3 139LB - major engine overhaul |
|
SABB type: L3 139LB 30HP 3000RPM | ||
![]() |
![]() |
|
Engine head ready for assembly. | ||
![]() |
![]() |
|
New engine block. | ||
![]() |
![]() |
|
Dismantling of engine accessories and components. | ||
![]() |
![]() |
|
![]() |
![]() |
|
![]() |
![]() |
|
Removing the gearbox. | ||
![]() |
![]() |
|
Flywheel. | ||
![]() |
![]() |
|
Removing the crankshaft. | ||
![]() |
![]() |
|
Comparing engine blocks to each other. | ||
![]() |
![]() |
|
Transfer of components to the new engine block. | ||
![]() |
![]() |
|
Thrust bearing. | Crankshaft. | |
![]() |
![]() |
|
Main bearing housing locking pins. | ||
![]() |
![]() |
|
Shaft seal. | ||
![]() |
![]() |
|
![]() |
![]() |
|
Timing assembly. | ||
![]() |
![]() |
|
![]() |
![]() |
|
![]() |
![]() |
|
![]() |
![]() |
|
![]() |
![]() |
|
![]() |
![]() |
|
Installing the piston rings and installing the pistons into the cylinders. | ||
![]() |
![]() |
|
![]() |
![]() |
|
Oil pump suction. | ||
![]() |
![]() |
|
Installing the head with new seals. | ||
![]() |
![]() |
|
Fuel pumps. | ||
![]() |
![]() |
|
Install the head and tighten according to the manual. | ||
![]() |
![]() |
|
![]() |
![]() |
|
![]() |
![]() |
|
![]() |
![]() |
|
Installing the cylinder head accessories and tightening the injectors. | ||
![]() |
![]() |
|
![]() |
![]() |
|
Thermostat. | ||
![]() |
![]() |
|
Intake and exhaust manifold. | ||
![]() |
![]() |
|
![]() |
![]() |
|
![]() |
![]() |
|
Connecting the electrical installation. | ||
![]() |
![]() |
|
Engine starting and testing. | ||
![]() |
||
Copyright © 2024 by Magpaw (Engineer officer). All rights reserved. |