Valve

             > engine room > valve

                 

  polski       

Hydraulic

 

/   / /

REPLACEMENT OF PARTS

 
Pump ballast valve 22 phot.

INSPECTION

 
Hand pump "Damcos" 20 phot.
Servo-motor 10 phot.

BREAKDOWN

 
Position sensor 15 phot.
Valve seal 10 phot.
Emergency pump 8 phot.
Single 6 phot.
Pneumatic

 

/   / /

BREAKDOWN

 
Single 3 phot.
   
   
   
Check valve

 

/   / /

REGENERATION

 
Single 9 phot.

INSPECTION

 
Quick closing valve 5 phot.

BREAKDOWN

 
Quick closing valve 12 phot.
Single 12 phot.
Butterfly    

REGENERATION

 
SW - inlet to LT cooler 6 phot.
Single 10 phot.

CHANGE

 
HT pump 4 phot.

BREAKDOWN

 
Single 7 phot.
Work in high temperature 7 phot.
Gate    

REGENERATION

 
kingston 12 phot.
Single 12 phot.

BREAKDOWN

 
Single 4 phot.
Wafer check    

BREAKDOWN

 
LT pump 4 phot.
Sea water pump 5 phot.
HT pump 12 phot.
   
   
Pipelines

 

/   / /

REPAIR

 
ASH AND RAIN COLLECT TK. 20 phot.

CLEANING

 
Cylinder oil tank 4 phot.
Bilge tank - cleaning 16 phot.
Cylinder oil measuring tank 7 phot.

OTHER

 
Non-return valves of cargo hold stripping system 7 phot.
Ballast water management system UV 10 phot.
Bilge 8 phot.
Sounding head 8 phot.
Test 4 phot.

BREAKDOWN

 
Single 23 phot.
Compensator - single 8 phot.
Ballast pipe line compensator 10 phot.
LT cooler SW pipes 36 phot.
Pipe flange connection 8 phot.
Calorifier 6 phot.
Technical water TK. - cracks 11 phot.
Ballast line 10 phot.

                                                        Copyright © 2004 - 2017 by Magpaw  (Engineer Officer). Wszelkie prawa zastrzeżone.